Overview

The system that heats and cools Bilton Towers dates back to 1963 and is now reaching the end of its life-cycle.  Its replacement is now necessary.  The proposed replacement system will generate energy costs savings of at least 25% whilst providing greater comfort, with the ability to control the temperature and air-flow room by room, and remote access to switch the heating or cooling on prior to returning to a flat after a prolonged absence.

This project will be presented and discussed at the AGM on 22nd June to obtain the shareholders’ approval.

View the slide presentation outlining this major refurbishment project